AC 1 Phase 2 Wire Static Energy Meter

(3.5 Reviews)
  • A lot of people have a misconception that Air Conditioners require a three-phase connection. Which actually is not true because all ACs have motors designed to run on single-phase. Only if you have more than 3 ACs that are all in use together you may need a three-phase connection.
The Digital Energy meter works on Digital Integration operating principle. There are no moving parts in it therefore it is also called as Static Energy Meter

Related Products

Three-Phase Static Energy Meter
Single-Phase Static Energy Meter
Single Phase Whole Current Energy Meter
Prepaid Static Energy Meter
Multi-Tariff Static Energy Meter
DIN Rail Mounted Static Energy Meter
Bi-Directional Static Energy Meter
AC 1 Phase 2 Wire Static Energy Meter